Concentric Casing System With Blocks

Concentric Casing System With Blocks
Concentric Casing System With Blocks

Drilling through formations with loose, unconsolidated material always comes with problems such as the borehole caving in or collapsing. How to avoid these problems?

With years of field practice and research, Maxdrill has developed its Concentric casing system with blocks applicable for foundation piling with backfill and pebble formations and casing depth within 50 meters.

1. When drilling starts, the pilot bit drives the casing shoe and casing tube.

2. When reaching the bedrock, reverse rotation of the tools and pull the pilot bit out from the hole.

3. Pour in concrete or move to the next construction procedure.

4. Use conventional tools to drill to the desired depth.